Kokosing Construction and Independence Excavating
Metro Health Center
McKinney Drilling
Doan Valley Tunnel (NEORSD)
McNally Tunneling Corp
“We have been pleased overall with R.L. Cole’s performance on the DVT project. Employees are always respectful and have had no problems with material delivered.”
“We will continue to consider R.L. Cole for any trucking/ stone delivery needs on future projects.”
Dugway South Relief & Consolidation (DSRCS)
McNally Tunneling Corp.
DOAN Brook Bank Stabilization (NEORSD)
Tuscon, Inc.
“Always assisting with suggestions and resources for a smooth operation.””Always performs exceptionally well.”
“We will continue to reach out to R.L. Cole Enterprise and work to think outside the box for partnering opportunities.”
1st Stage Aeration & Return Sludge Pump Station
Shook Construction
ODOT 17301 CUY-177
Kokosing Construction
Easterly Tunnel Dewatering Pump Station
Ric-Man Construction, Inc.
7 School Projects with Cleveland Metropolitan School District (CMSD)
Phoenix Cement
Highlighted Projects
Westerly Storage Tunnel
NEORSD – Northeast Ohio Regional Sewer District in collaboration with Jay Dee/ Obayashi.
This $135M project is centralized around the construction of approximately 3,137 LF of 72-in (finished) diameter sewer and 50 LF of 48-in diameter sewer via trench-less methods, approximately 1,475 LF of 48-in diameter sewer via open-cut methods, and associated structures.
We are engaged for $1M worth of services for hauling and delivery of excavated materials.
Doan Valley Tunnel
NEORSD – Northeast Ohio Regional Sewer Disctrict in collaboration with McNally/Kiewit.
The $145M Doan Valley Storage Tunnel project comprises 10,000 ft of 18-ft diameter storage tunnel and two 8.5-ft diameter conveyance tunnels at 3,000- and 6,400-ft lengths. Third project is part of Project Clean Lake for NEORSD that includes several major tunnel components to store and convey combined sewer overflows.
We’ve been engaged for $921K, four years (2017 to 2021) to services for hauling and delivery of excavated materials.
London Road Relief Sewers
Triad McNally JV is managing the London Road Relief Sewer Project.
This project is designed to control combined sewer overflows (CSOs) and provide additional conveyance capacity to help alleviate surcharging in the cities of Cleveland and East Cleveland.
Projected End Date – November, 2020
We’ve been engaged for $39.6K to provide hauling and delivery services of excavated materials.
Opportunity Corridor-Phase 3
Ohio Department of Transportation (ODOT) – in collaboration with Kokosing Construction and Independence Excavating, Inc.
We Worked on the 1.8-mile section of Phase 3 of the Opportunity Corridor Project. We began work on this project in the Summer of 2019 and our work will conclude in 2021.When finished, Opportunity Corridor will extend from I-490 at East 55th Street to East 105th Street near the Cleveland Clinic.
We are contracted with Ind. Exc. for four years totaling $175K for Hourly Trucking.
We are contracted with Kokosing Constr. for four years for $150K for Material supply.
We are contracted with Kokosing Constr. for four years for $58K for hourly Trucking